GE Healthcare Australia Pty Limited

Radiology Fitout at Liverpool Hospital CT and Control Room

GE Healthcare Australia Pty Limited were contracted to Liverpool Hospital to provide them with a new CT machine and room. Cassins performed the radiological fitout to the room. Works included:

  • Site investigations, preparation, drilling, removal of floor covering, cement topping and ramping of floor
  • Installation of lead shielding for walls and double doors
  • Install plasterboard linings over lead shielding and painting walls
  • Vinyl flooring to CT and Control rooms
  • Build open shelving units
  • Electrical and air conditioning upgrades

About The Client

GE Healthcare Australia Pty Ltd for Liverpool Hospital

  • Site investigations, preparation, drilling, removal of floor covering, cement topping and ramping of floor
  • Installation of lead shielding for walls and double doors
  • Install plasterboard linings over lead shielding and painting walls
  • Vinyl flooring to CT and Control rooms
  • Build open shelving units
  • Electrical and air conditioning upgrades